해양 (Offshore Structure)실적 (Records)

사천공장 (DHI-S)

1. Module Unit

NO Clients Country Customer Completed Remarks
1 LEIF HOEGH Norway Samsung Heavy Ind. June '08 145K㎥ LNG
2 HANJIN Korea Samsung Heavy Ind. July '08 4,300 Cont.
3 HANJIN Korea Samsung Heavy Ind. July '08 4,300 Cont.
4 National Iran Tank Corp. Iran Samsung Heavy Ind. July '08 317K VLCC
5 O.O.C.L. HK Samsung Heavy Ind. Oct. '08 4,500 Cont.
6 A. P. MOLLER Denmark Samsung Heavy Ind. Nov. '08 145K㎥ LNG
7 PREDUMA Italy Samsung Heavy Ind. Jan. '09 115K P.C.
8 YASA Turkey Samsung Heavy Ind. Jan. '09 158 C.O.T.
9 YASA Qatar Samsung Heavy Ind. Mar. '09 267K㎥ LNG
10 LEIF HOEGH Norway Samsung Heavy Ind. Mar. '09 145K㎥ LNG RV
11 CHANDRIS Greece Samsung Heavy Ind. Mar. '09 158 C.O.T.
12 DAMICO U.S.A. Samsung Heavy Ind. Apr. '09 158 C.O.T.
13 O.O.C.L. HK Samsung Heavy Ind. May '09 4,500 Cont.
14 Qatar Gas Transfer Corp. Qatar Samsung Heavy Ind. May '09 267K㎥ LNG
15 O.O.C.L. HK Samsung Heavy Ind. June '09 4,500 Cont.
16 Qatar Gas Transfer Corp. Qatar Samsung Heavy Ind. June '09 267K㎥ LNG

2. Trunk Deck Module Unit

NO Clients Item Assembly Completed Remarks
1 AP MOLLER, DANAOS, TANK TOP UNIT 11 SETS 2010
HANJIN, NITC, OOCL,
NEXUS, LEIF HOEGH,
2 DUNYA, TEEKAY, GEDEN PASSAGE WAY 5 SETS 2011
CHANDRIS, CAPITAL, ALBA, PUMP ROOM 2 SETS
BG, DAMICO, JMR, HANJIN TANK TOP UNIT 21 SETS
3 OFFEN, CARDIFF, TARGET PASSAGE WAY 19 SETS 2012
PUMP ROOM 8 SETS
STENA, EINAVAL, MINT UNDER DECK 5 SETS
DAMICO, JMR, UASC TANK TOP UNIT 8 SETS
4 CARDIFF, ENESEL PUMP ROOM 22 SETS 2013
AET, STENA, OFFEN PASSAGE WAY 9 SETS
UASC, YASA, DAMICO, TANK TOP UNIT 30 SETS
5 GASLOG, GOLAR PUMP ROOM 10 SETS 2014
OOCL, CHEVRON, TEEKAY TANK TOP UNIT 27 SETS
6 IMABARI SHIPBUILDING JAPAN Engine Room Unit 28 SETS 2015 LNGC
Trunk Deck Unit 12 SETS
7 JAPAN MARINE UNITED SHIPBUILDING Engine Room Unit - 2017, 2018 LPGC
Trunk Deck Unit 10 SETS

3. LNG Terminal

No Clients Country Items Due Date Remarks
trestle Area Berth Area
1 KOGAS 6th Extension of 2nd Stage Project Korea Piping & Steel Structure Feb. ~ Apr. ‘10 May ~ Jul. ‘10
Installation at site Apr. ~ May ‘10 Aug. ~ Sept. ‘10

4. Offshore

No Clients Project Customer Product Weight(Ton) Completed Remarks
1 TEEKAY FPSO SHI Pipe Rack/Platform 1,759 Jun. 2014
Escape Tunnel 157 Jan. 2013
2 SHELL F-LNG SHI Flare Tower 138 Sept. 2014
Prelude Vertical Bracing 720 Apr. 2014
3 INPEX Ichthys CPF SHI Large Platform 486 Apr. 2015
Pipe Rack 977 Mar. 2015
4 Martin Platform SHI L. Platform 378 Jul. 2015
Pipe Rack 266 Jul. 2015
5 Mariner Platform HO Leg & Brace 949 Jun. 2015
6 Gina Krog Platform HO Deck Block 1,107 Jul. 2015
7 Statoil Cat-J Rig SHI Helideck, FLS,
Wind wall
898 May. 2016
8 ZADCO UZ750K HO Leg & Brace 664 Dec. 2015
9 Egina FPSO SHI Pipe Rack, Platform 1,191 Mar. 2016
10 Petronas FLNG 2 SHI Pipe Rack, Platform 855 Mar. 2016
11 Shell Appomattox SHI Column 1,388 Sept. 2016
12 TCO TCO project HO Deck Block & Pipe Rack 3,794 June. 2019
13 MD2, ENI CORAL FLNG SHI Stair tower/Steel outfitting 474 June. 2019
14 ENETI WTIV Gusto MSC NG-16000X HO SPUDCAN 1,318 June. 2023
15 NOC Gallaf Batch-3 EPCIC06 HO Node, Box Girder, 3,540 Sep. 2023
Secondary, Brown Field
16 Petrobras P79 FPSO HO Cassion & Protector, Diving Station 4,772 June. 2023
Offloading Platform, Life Boat Platform
MSM, Raier Pull-in structure
17 Chevron P.6065 Jansz-lo(JIS) HO Truss, I-Tube, N.E. Pull in structure, Protector, Top deck 1,793 June. 2024
18 CADELER WTIV HO P.3307 X-Brace for Leg 100 July. 2024
19 ENETI WTIV Gusto MSC NG-16000X HO Helideck, Anchor rack, Light post 131 July. 2024
20 Chevron P.6065 Jansz-lo(JIS) HO HV,LV,TRUSS,Crane Pedestal 1,701.1 Aug. 2024
21 CADELER WTIV HO Leg(Upper, Lower) 1,420.8 Sep. 2024

통영공장 (DHI-T)

Clients Project Product Q'TY(Ton) PERIOD Remarks
start completed
6064 Petrobras P79 FPSO MSM : 10 block (1288.913 Ton)
Pull-in structure : 2 block (Node)
2,634.4 Mar. 2023 Jan. 2024 Completed
3306 ENETI WTIV Gusto MSC NG-16000X Helideck rack, Light post 111 May. 2023 May. 2024 On Going
6065 Chevron Zansz-IO HV, LV, TRUSS 1,701.1 Oct. 2023 May. 2024 On Going
3307 CADELAR WTIV Gusto MSC NG-16000X Leg(Upper, Lower) 1,420.8 Feb. 2024 Seb. 2024 On Going